In the block, asphalt pavements, driveways, parking lots with 205 parking spaces, and sidewalks were reconstructed. Children’s playgrounds, concrete outdoor chess tables and table tennis tables were installed, trampled paths were paved with concrete blocks, and 2.5 m-wide paths for pedestrians and bicycles were paved.
In the narrow yards of apartment buildings, areas paved with concrete openwork blocks have been designed, on which temporary parking of vehicles is possible. The installation of a new smooth asphalt pavement has reduced the noise caused by vehicles, the quantity of dust and quantity of gases emitted by vehicles. The area was adapted for people with disabilities.