Reconstruction works of one of the main streets in the central part of Elektrėnai city were carried out. The roadway of the street was renovated, parking spaces were installed, and pedestrian paths were reconstructed. New street lighting networks, traffic light arrangement, and rainwater drainage networks were designed. 43 parking spaces, 2.6–4.0 m-wide pedestrian paths, and pedestrian and bicycle paths were installed. The length of the street is 307 m and it has two traffic lanes. The width of the roadway is 9 m.